Only used when this part ships on an invoice to a non-USA customer.
HS code is the harmonized tariff code (6-10 digits); COO is the country
of manufacture.
Pulling this part to a WO auto-adds a disposal-fee line. Removable on the invoice. Use for tires & batteries - NOT for wheel assemblies.
leave blank for default $65
Using this part on a WO creates a core-return obligation for the tech. The removed core must come back with a Green Repairable tag.
-
Check Out Part
Checks out units into your possession. Stock counts don't drop yet - they decrement when you scan onto a work order. Return whatever you don't end up using on the My Checkouts page.
-
Lot-tracked part. Pick the lot you're physically pulling.
If you already know the WO. Otherwise just scan onto a WO later - it'll auto-close.
Update Stock
Pick the location whose stock you're updating, enter the new on-hand count, and confirm.
-
Bins at -
List each bin and how many units sit in it. The location's on-hand total is set to the sum below.
Tip: separate fields with " Β· " to keep the labeled view above.
Import Grant Inventory Sheet
Drop in the BSA STOCK spreadsheet to load or refresh stock.
β Condition Only Update does not create parts, does not create stock, and does not change quantities.
For matched bins, the spreadsheet will replace the condition split for that bin.
Stock Drift Audit
Read-only. Finds where location, bin, and condition-bucket quantities disagree. Nothing is changed.